Has anybody ever connected Qualtrics and Power BI? Qualtrics has an API connection available but I don't know how I would connect to be able to import survey results from the site.
Qualtrics API
Error: Too many elements in the enumeration to complete the operation
I have downloaded a bunch of files (each one has one set of data of the power consumption of an electronic device) to Power BI. My goal is to graph the Power along time, so I only need the power values and the timestamp. When I try to pivot the column to get one column for power and one column for timestamp I get this error :
Too many elements in the enumeration to complete the operation
Name | Value |
power_mw | 0 |
timestamp | 2019-04-24T11:45:57.396440 |
power_mw | 0 |
timestamp | 2019-04-24T11:46:02.188844 |
power_mw | 0 |
timestamp | 2019-04-24T11:46:07.416614 |
power_mw | 0 |
timestamp | 2019-04-24T11:46:12.207765 |
power_mw | 0 |
timestamp | 2019-04-24T11:46:17.435759 |
power_mw | 0 |
timestamp | 2019-04-24T11:46:22.226059 |
power_mw | 0 |
timestamp | 2019-04-24T11:46:27.164159 |
power_mw | 7163 |
timestamp | 2019-04-24T11:46:32.252352 |
power_mw | 4922 |
timestamp | 2019-04-24T11:46:37.187028 |
power_mw | 4464 |
timestamp | 2019-04-24T11:46:42.371088 |
power_mw | 1747 |
timestamp | 2019-04-24T11:46:47.203619 |
The table is way bigger than this one, this is just an example. Can anyone please help?
Problem with connecting to Access Database
When trying to connect with an access Database it will give me the following error:
"The database you are trying to open requires a newer version of Microsoft Access"
I'm using access with Microsoft Office 2019 Professional Plus. Seems new enough to me.
Please help! Thanks
Can't connect to DataLake source for auto refresh
I have a few data lake source I am trying to connect my reports to for auto refresh, but I keep running into auth problems. I don't run into issues when connecting directly in my PBIX file. Only when I try to schedule auto refresh in the power bu page. Attached is a screen shot. I'm not the only one running into this in my team.
.
Data Source with R
I am unable to import excel using R Script in Power BI.
Below is the code I am trying to execute:
library(readxl)
dataset <- read_excel("C:\\Users\\sumit.gupta5\\Desktop\\Loan.xlsx",sheet = "Sheet1")
and below is the error I am getting:
Details: "Exception of type 'Microsoft.Analytics.Modules.R.ErrorHandling.RException.Primitives.NotValidRDataException' was thrown."
Please help !
Error with Data Load from Excel
Hi,
When i load data from excel it leaves lots of rows blank then load the data.
Anyone can help?
Forms & PowerBI integration data
Hi,
I am trying to put different data of FORMS in PowerBI,
My problem is that the forms are created by different workers and I have to design with the datas of this forms a reports about it in PowerBI.
I can use the data of MY forms thanks to MicrosoftFlow but I don´t know how can do the same with the others FORMS.
If possible to take the data of the different worker with MicrosoftFlow as I am doing with my own Forms?
thanks
Persisting data while using API as a data source
Hello Gurus,
I am trying to connect to a API for ingesting data onto PowerBI.
The connection behaves correctly using the web connector. However, I have a problem with persisting the data between refresh.
So my API refreshes every 60 seconds and returns last 1 minute data.
Upon successful connection, I am being able to see last 1 minute data populated in the table.
But, next minute when the API refreshes, the data is entirely replaced and no appended.
Is there a way to persist the old data while with every API refresh, the new set of rows will add to the data .
Is there a way of doing the above directly on Power BI
Kindly Help.
Thank you very much for your time.
Regards,
Dev
I have a shared folder on one drive which I want to connect to with power BI. how do I do this
I have setup the links to connect to individual files in One Drive.
However when I copy the link for the folder I get an error "The folder must be a valid absolute file path"
Any suggetions?
On-Premise Gateway - trying to connect to no longer existing data sources in Dataset
I have created a report in PBI Desktop and uploaded to the Service.
I've installed an On-Premise Gateway and attempting to schedule the refresh however the Gateway Status is shown as "Not configured correctly".
This is because the Gateway is stating that 3 Data Sources have not been added to the Gateway.
The 4 used Data Sources are fine with green ticks.
The 3 erroneous data source are no longer used and have been removed from the report in Desktop (don't show in "Data Source Serrings" or in "Edit Queries") and then re-published to the Service, however the Gateway stills sees them.
DV360 connection in Power BI
Hello,
Has anyone here successfully connected to DV360 and created performance reports on Power BI?
I am not sure how to go about it, as I have a dashboard created on Google Data Studio but because of its limitations on blending data from other sources, I want to import the DV360 data into Power BI.
Thanks,
Load table from another PBI model
Hi
I am in a situation where I need to import one table from another PBI model. The table is built from several data sources and I would hate to import it all and redo all the queries to make a duplicate.
I don't see why it shouldn't be possible to just point to that table and import it to my other model? But how??
Make On-premises Cluster Gateway without Power BI
I am currently using a personal gateway.
Does the PC that will be on all the time need to have Power BI installed or anything like a separate Pro License to be used as the main gateway? Or do I just need to install the gateway on that one, and then the PCs that will be used will have BI installed on them?
And is a Pro license enough for all this?
PDF Connector: table on multiple pages
I'm trying to import data from a PDF file, but a table bigger than one page is imported in Power Bi as multiple tables.
Is there any workaround?
Load datas using incremaental
I'm trying to find a way to do the process describe below :
-first request return a total number of record to be loaded (json.documents)
Keep the number of record to be loaded & loaded data using 100 record by 100 record
-load data mutiple time to load all data regarding original number of record. (json.document too)
How to do this in PowerBi.
Sample :
load 1 : return a field who give us 153 records.
load 2 : load the 100 first record
load 3 : load the next 53 records
load 4 : combine data from load 2 & 3, and do same tranformation.
Many thanks for your help,
Gaetan
Connecting to ODBC Data Source through VPN with Data Gateway
I use the Data Gateway for multiple connections, using ODBC, Azure SQL Server, etc. I now have a data source that is an ODBC connection that I must VPN to from the machine with the Gateway on it. I can manually connect to the VPN from the Gateway machine and get a successful connection to the ODBC data source. However, when I go to PowerBI Service online and add the Gateway connection, using anonymous credentials just as I do on the local machine, I get an invalid credentials error message:
Activity ID: 4c584074-0baf-440a-84b4-baa257bb3069 Request ID: b21471ac-75e4-74ee-18bf-4bc055261bbd Cluster URI: https://wabi-west-us-redirect.analysis.windows.net Status code: 400 Error Code: DMTS_UpdateClusterDatasourceCredentialsErrorCode Time: Thu May 09 2019 10:58:05 GMT-0400 (Eastern Daylight Time) Version: 13.0.9340.155 ITServices: Invalid connection credentials. Underlying error code: -2147467259 Underlying error message: The credentials provided for the Odbc source are invalid. (Source at dsn=CabellDW.) DM_ErrorDetailNameCode_UnderlyingHResult: -2147467259 Microsoft.Data.Mashup.CredentialError.DataSourceKind: Odbc Microsoft.Data.Mashup.CredentialError.DataSourcePath: dsn=CabellDW Microsoft.Data.Mashup.CredentialError.Reason: AccessUnauthorized Microsoft.Data.Mashup.MashupSecurityException.DataSources: [{"kind":"Odbc","path":"dsn=CabellDW"}] Microsoft.Data.Mashup.MashupSecurityException.Reason: AccessUnauthorized
The data source requires that I set up the credentials in the windows credentials manager and then leave credentials blank on the ODBC setup. Again, it works from server machine that has the Gateway on it. But PowerBI Service online fails when trying to utilize the Gateway to connect. I hope this makes sense. I'm lost. Any suggestions?
Text Analytics API - "We couldn't authenticate with the credentials provided. Please try again."
I have been at this error for longer than I'd care to state.
I'm simply trying to applly the Text Analystics API to an Excel file. My goal is to extract key words from each comma divided cell.
I am attempting to access the web content "Anonymously" as this guide states.
The key from the cognitive services dashboard was also placed within the code so I'm sure it cannot be that.
Please help me.
dataflows vs push dataset refreshes
hello im looking at these two articles
https://docs.microsoft.com/en-us/power-bi/service-dataflows-overview
https://docs.microsoft.com/en-us/power-bi/service-real-time-streaming
and im trying to understand would be the advantages/disadvantages of using one method over the other
both articles seem to being saying that they both do the same - are they?
but thats also bc im not as familiar with the azure and its data services
would someone mind breaking down the basic diffs and in which scenario you would use one over the other?
i also read this post and didnt get much more clarification
https://community.powerbi.com/t5/Service/Dataflow-vs-Dataset-refresh/m-p/572076#M57973
thx so much
Change account associated with the Data Gateway
Hi all,
Is it possible to change the account that has been used to install the on-prem data gateway with? For example I'm using it right now with admin@domain1.onmicrosoft.com, but in the future we have to use the same gateway for a different domain and use it with user admin@domain2.onmicrosoft.com. Is this possible?
Note: We don't need both domains to access the gateway.
Thanks,
D365FO BI reports deployment
how can i deploy my Power BI report to D365FO enviroment ?
the steps i followed are:
- i uploaded by .pbix file in Asset library
- then went system administration > power bi files deployment
- when i selected my file and pressed deploy bi files option it gave me an error "Deployment failed for file"
please someone can help me regarding this issue, i am unable to upload my BI report in D365Fo.